Azure Beach Resort - Hotel & Resort · Da Nang, Vietnam
SELECTED WORK

Azure Beach Resort

Hotel & Resort · Da Nang, Vietnam

SHORT ANSWER

A hotel FF&E package is a room-by-room supply of furniture, fixtures and finishes to an operator standard. For Azure Beach Resort Danang — a beachfront resort — we supplied guest-room flooring, bathroom packages and custom furniture for 120 keys.

Azure Beach Resort - fit-out detail

Azure Beach Resort

Location: Da Nang, Vietnam
Type: Hotel & Resort
Scope: Flooring, Lighting, Bespoke Furniture

A hotel FF&E package is a room-by-room supply of furniture, fixtures and finishes to an operator standard. For Azure Beach Resort Danang — a beachfront resort — we supplied guest-room flooring, bathroom packages and custom furniture for 120 keys. All finishes were approved via 3D renders and physical samples before production, with container shipments sequenced floor by floor to match the contractor’s fit-out schedule.

Start a Similar Project →

What We Supplied.

Azure Beach Resort was delivered as a single package: flooring, lighting, bespoke furniture. Each line was specified against Da Nang’s monsoon humidity and typhoon-season wind, then sourced, sampled and consolidated before it left Foshan.

01

Flooring

Porcelain, engineered timber or SPC specified for dimensional stability — low moisture movement, and a surface that stays comfortable underfoot in the heat.

02

Lighting

A layered scheme — ambient, task and accent — on dimmable drivers, with warm colour temperature and a spare-parts list handed over with the project.

03

Furniture

Made-to-drawing pieces in solid timber, veneer and upholstery, prototyped where the run justifies it and finished in fabrics sampled in advance.

Notes from the Site.

Da Nang's monsoon season is the design constraint that no render shows — the beachfront elevation takes driving rain for weeks at a time, and the typhoon-season wind loads rule out anything loose on the exterior. The guest-room specification was driven by the wet-season humidity: flooring with a wear layer that tolerates wet traffic from the pool side, bathroom packages sealed to the room's own drainage logic, and furniture frames in powder-coated aluminium so a season of monsoon humidity does not move the joints.

120 keys, sequenced to the build

  • Guest-room flooring, bathroom packages and custom furniture for 120 keys, approved via 3D renders and physical samples before production.
  • Container shipments sequenced floor by floor to match the contractor’s fit-out schedule — floor 3 was fitted before floor 4 was ready.
  • Furniture frames in powder-coated aluminium, chosen because the monsoon humidity moves timber joints in an unconditioned room.

The site problem was the typhoon window. The contractor's programme had the guest-room fit-out running through September, which is the middle of the typhoon season on the central coast, and the client's risk assessment required that no loose material be stored in the building during a storm warning. We split the deliveries so each floor's kit arrived the week that floor was ready to receive it — no material in the building longer than a fortnight. The contractor's own forecast had assumed bulk delivery and site storage; ours cost two extra freight legs and zero storm-damage claims.

How a Project Like This Runs.

Send us a drawing, a BOQ or even a reference photo and we will price it against the same supply chain — certificates matched to your market, samples before production, and one consolidated shipment instead of six.

01

Scope & Budget

We work from your drawings or BOQ, flag anything that will not survive Da Nang's monsoon humidity and typhoon-season wind, and return a priced scope with lead times.

02

Samples & Drawings

Material samples and shop drawings go out for approval. Nothing enters production until you sign off.

03

Production & QC

Batch inspection reports and production photos at each key stage, issued before the container is sealed.

04

Shipment & Handover

Export packing, supervised loading and a documentation set listed on the packing list, so clearance and site handover do not stall.

Project in Pictures.

Project FAQ

What does INDECO supply for hotels and resorts?

We fit out hotels and resorts with guestroom furniture, bathroom vanities and sanitary ware, lighting, doors, wall panels, luxury stone, soft furnishings and FF&E — coordinated as one package for brand consistency.

Can you meet a hotel brand's specification and fire standards?

Yes. We match operator specifications and supply fire-rating, CE, SGS and FSC certificates per destination market. Shop drawings and prototypes are approved before mass production of guestroom packages.

How do you handle a large hotel rollout internationally?

We phase production and container shipments to your opening schedule, consolidate all lines into single consignments, and provide QC reports and installation guidance for on-site teams worldwide.

Can INDECO match an existing hotel FF&E standard for refurbishments?

Yes. Send us the brand's FF&E specification or a sample of the existing piece and we match finishes, fabrics and hardware, with pre-production samples submitted for approval.

Do you phase deliveries for hotels that stay open during renovation?

Yes. We pack and label by floor and room number and ship in phased batches matched to your renovation schedule, so occupied floors are never disrupted.