Heritage Hotel Renovation - Hotel & Resort · Marrakech, Morocco
SELECTED WORK

Heritage Hotel Renovation

Hotel & Resort · Marrakech, Morocco

SHORT ANSWER

A heritage hotel renovation is a phased supply of period-appropriate flooring, discreet sanitary upgrades and restored joinery, delivered in small batches so the hotel never fully closes. The Marrakech property below is such a project.

Heritage Hotel Renovation - fit-out detail

Heritage Hotel Renovation

Location: Marrakech, Morocco
Type: Hotel & Resort
Scope: Flooring, Sanitary, Joinery

A heritage hotel renovation is a phased supply of period-appropriate flooring, discreet sanitary upgrades and restored joinery, delivered in small batches so the hotel never fully closes. The Marrakech property below is such a project. INDECO matched period-appropriate flooring, discreet sanitary upgrades and restored joinery — supplied in small, phased batches so the hotel never fully closed.

Start a Similar Project →

What We Supplied.

Heritage Hotel Renovation was delivered as a single package: flooring, sanitary, joinery. Each line was specified against Marrakech’s 45°C summer peaks and cold desert nights, then sourced, sampled and consolidated before it left Foshan.

01

Flooring

Porcelain, engineered timber or SPC specified for dimensional stability — low moisture movement, and a surface that stays comfortable underfoot in the heat.

02

Sanitary Ware

Wall-hung and rimless units with accessible service voids, so routine maintenance does not mean breaking open finished walls.

03

Joinery

Wardrobes, vanities and wall panelling produced from approved shop drawings, with veneer and finish samples signed off before production.

Notes from the Site.

A heritage property renovation in Marrakech runs on two constraints that pull against each other: the building's protected fabric, which you cannot chase or drill, and the hotel's occupancy, which you cannot close. Every sanitary upgrade was designed as a like-for-like swap into the existing positions — the new wall-hung units mounted on frame supports that stand on the floor and carry the load to the slab, so no chasing into the old walls. The joinery was restored on site where the fabric allowed, and replaced in matching timber where it did not.

Phased around the guests

  • Period-appropriate flooring matched to the existing pattern — new tiles laid to the same module so the old and new floors read as one.
  • Sanitary upgrades on floor-standing frame supports, so no load is carried by the heritage walls and no chasing was needed.
  • Joinery supplied in small, phased batches so the hotel never closed a wing — each batch fitted in the rooms the hotel had already taken out of service.

The site lesson was the tiles. The existing floor pattern is a zellige module that has not been manufactured for sixty years, and the client's architect had assumed a modern tile would have to be a compromise. Our tile supplier matched the module and the glaze from photographs and a physical rubbing the architect sent — the first sample was 2 mm out on the module, the second was inside tolerance. The hotel's guests never noticed the boundary between the old floor and the new, which is the only compliment that matters on a heritage job.

How a Project Like This Runs.

Send us a drawing, a BOQ or even a reference photo and we will price it against the same supply chain — certificates matched to your market, samples before production, and one consolidated shipment instead of six.

01

Scope & Budget

We work from your drawings or BOQ, flag anything that will not survive Marrakech's 45°C summer peaks and cold desert nights, and return a priced scope with lead times.

02

Samples & Drawings

Material samples and shop drawings go out for approval. Nothing enters production until you sign off.

03

Production & QC

Batch inspection reports and production photos at each key stage, issued before the container is sealed.

04

Shipment & Handover

Export packing, supervised loading and a documentation set listed on the packing list, so clearance and site handover do not stall.

Project in Pictures.

Project FAQ

What does INDECO supply for hotels and resorts?

We fit out hotels and resorts with guestroom furniture, bathroom vanities and sanitary ware, lighting, doors, wall panels, luxury stone, soft furnishings and FF&E — coordinated as one package for brand consistency.

Can you meet a hotel brand's specification and fire standards?

Yes. We match operator specifications and supply fire-rating, CE, SGS and FSC certificates per destination market. Shop drawings and prototypes are approved before mass production of guestroom packages.

How do you handle a large hotel rollout internationally?

We phase production and container shipments to your opening schedule, consolidate all lines into single consignments, and provide QC reports and installation guidance for on-site teams worldwide.

Can INDECO match an existing hotel FF&E standard for refurbishments?

Yes. Send us the brand's FF&E specification or a sample of the existing piece and we match finishes, fabrics and hardware, with pre-production samples submitted for approval.

Do you phase deliveries for hotels that stay open during renovation?

Yes. We pack and label by floor and room number and ship in phased batches matched to your renovation schedule, so occupied floors are never disrupted.