Lakeside Apartments - Apartment · Kigali, Rwanda
SELECTED WORK

Lakeside Apartments

Apartment · Kigali, Rwanda

SHORT ANSWER

A repeatable residential kit is flooring, sanitary ware and lighting packaged as one approved spec to cut on-site variation. Lakeside Apartments in Kigali is a mid-rise block standardised across 60 units.

Lakeside Apartments - fit-out detail

Lakeside Apartments

Location: Kigali, Rwanda
Type: Apartment
Scope: Flooring, Sanitary, Lighting

A repeatable residential kit is flooring, sanitary ware and lighting packaged as one approved spec to cut on-site variation. Lakeside Apartments in Kigali is a mid-rise block standardised across 60 units. INDECO packaged flooring, sanitary ware and lighting as a repeatable kit, cutting on-site variation and letting the developer roll unit after unit from the same approved spec.

Start a Similar Project →

What We Supplied.

Lakeside Apartments was delivered as a single package: flooring, sanitary, lighting. Each line was specified against Kigali’s equatorial rainfall and year-round humidity, then sourced, sampled and consolidated before it left Foshan.

01

Flooring

Porcelain, engineered timber or SPC specified for dimensional stability — low moisture movement, and a surface that stays comfortable underfoot in the heat.

02

Sanitary Ware

Wall-hung and rimless units with accessible service voids, so routine maintenance does not mean breaking open finished walls.

03

Lighting

A layered scheme — ambient, task and accent — on dimmable drivers, with warm colour temperature and a spare-parts list handed over with the project.

Notes from the Site.

Sixty units off one approved spec is how a mid-rise development stays on programme — the repeatable kit means the fit-out crew learns the sequence on unit 1 and runs it unchanged to unit 60. Kigali's year-round humidity and equatorial rainfall meant the specification was driven by moisture management before anything else: the flooring wear layer, the sanitary ware's sealing detail, and the lighting's ingress protection on the corridor units that face the prevailing rain.

The repeatable kit

  • Flooring, sanitary ware and lighting packaged as one approved kit — the fit-out crew runs the same sequence in every unit.
  • Sanitary ware specified with accessible service voids so the facilities team can service without breaking tile.
  • Corridor lighting sealed against driving rain on the exposed elevations, standard units elsewhere.

The site lesson was the lift again, but a different version of it. The developer's own programme had the lift in use for the structural trades until two weeks before our flooring was due, which would have meant carrying 60 units' worth of material up the stairwells. We split the delivery so the flooring for the first twenty units went in the first container, and the remaining units' kits followed in a second shipment timed to the lift's release. The developer's PM later told us the second-half units finished a week ahead of his own forecast — because the kit sequence was already learned by then.

How a Project Like This Runs.

Send us a drawing, a BOQ or even a reference photo and we will price it against the same supply chain — certificates matched to your market, samples before production, and one consolidated shipment instead of six.

01

Scope & Budget

We work from your drawings or BOQ, flag anything that will not survive Kigali's equatorial rainfall and year-round humidity, and return a priced scope with lead times.

02

Samples & Drawings

Material samples and shop drawings go out for approval. Nothing enters production until you sign off.

03

Production & QC

Batch inspection reports and production photos at each key stage, issued before the container is sealed.

04

Shipment & Handover

Export packing, supervised loading and a documentation set listed on the packing list, so clearance and site handover do not stall.

Project in Pictures.

Project FAQ

Does INDECO supply materials for apartment buildings?

Yes. We equip apartments with kitchen cabinets, wardrobes, sanitary ware, doors, windows, flooring, wall panels and lighting, delivered as a standardised, repeatable package that keeps per-unit cost and lead time predictable.

Can you standardise finishes across many apartment units?

Yes. We lock one approved sample set and reproduce it across hundreds of units with batch-level QC, so every apartment matches the approved specification — ideal for developers and contractors.

What lead time for a multi-unit apartment fit-out?

Custom production runs 4–6 weeks per batch with global logistics 2–4 weeks. We phase deliveries to match your construction schedule and can hold buffer stock for later phases.

Do you supply kitchen cabinets and wardrobes for apartment projects?

Yes. Custom kitchen cabinets, wardrobes and vanities are produced from approved shop drawings, flat-packed for container efficiency and numbered per unit for straightforward installation.

Can INDECO supply show-unit furniture as well as bulk units?

Yes. We furnish the show unit first so buyers see the finished standard, then repeat the same specification at project scale for the remaining units.