Close inspection of an aluminium window frame profile before export packing
QUALITY · INSPECTION

Quality Control Before the Container Leaves

A mixed container is only as good as its weakest carton. Our inspection routine catches the dimensional, finish and packing errors that cost far more to fix on site than in Foshan.

Inspection is a stage, not a photograph.

Quality control in building material export is the inspection discipline that verifies whether the profile matches the drawing, the finish matches the approved chip, the quantity matches the packing list and the carton will survive a container journey to a humid port — because a checked box and a stamped certificate alone do not make a shipment correct.

We inspect at three points: when the raw material arrives, during production at the critical operation, and again at consolidation before the container is loaded. A third-party inspector is welcome at any of these stages, and we issue the drawings and the schedule needed to perform an independent check.

How does factory quality control actually work?

What is checked at the factory before loading?

Dimensional tolerances against the shop drawing, alloy and temper where relevant, coating thickness and colour against the approved RAL chip, glass build-up and sealing on insulated units, and the grade of visible hardware. For tiles and stone we check calibre, shade batch and water absorption; for cabinetry we check board moisture content and the fit of the first assembled unit.

Why is packing part of quality?

A perfect panel packed badly arrives cracked. We specify export cartons, corner protection, desiccant for humidity-sensitive goods and separation between metal and finished surfaces. Dense items are stowed low, fragile finished faces travel inward, and the container is photographed before the seal is fitted.

Can a third party inspect goods at the factory?

Clients may appoint their own inspector, and we coordinate the slot with the factory. We supply the purchase order, the approved sample, the drawing set and the packing list so the inspector can verify against the same standard we use. Test certificates for fire rating, slip resistance or coating performance are collated into the document set.

How are claims and replacements handled?

If damage is found at discharge, the seal photograph and the container condition note establish the baseline. Clear photographs of the cartons before opening, kept alongside the packing list, allow us to identify the line and quote replacement parts against the original order rather than starting a new negotiation.

ItemINDECO practice
Inspection stagesRaw material, in-process, pre-loading
Dimensional checkAgainst issued shop drawing
Finish checkRAL chip / approved sample standard
PackingExport carton, corner guard, desiccant
Third partyWelcome; drawings and sample supplied
EvidenceSeal photo, packing list, container note

Frequently asked questions

What inspection should I do before a container loads?

Verify quantity against the packing list, check that the finished faces match the approved sample or RAL chip, confirm cartons are dry and intact, and photograph the container before and after loading. For a mixed order, open one carton from each line so the contents are recorded. We perform these checks ourselves and welcome the client or their inspector to repeat them.

Can a third party inspect goods at the Foshan factory?

Yes. Tell us the inspection company and the date and we coordinate access with the factory. We provide the purchase order, the approved sample, the shop drawings and the packing list so the inspection is against the same standard as production. Inspection is best scheduled after packing is complete but before the container is sealed.

How do I claim against a damaged shipment?

Photograph the container seal and the cartons before opening, keep the packing material, and send the images with the carton number from the packing list. That lets us identify the line and the stage of loss. We then issue a replacement quotation against the original schedule or adjust the next order, depending on what the evidence shows.

What certificates come with the materials?

Depending on the line: mill or alloy certificates for aluminium, test reports for fire rating or slip resistance, coating thickness records, and QC sign-off sheets for cabinetry and furniture. All certificates are collated into the shipment document set and referenced to the item numbers on the packing list.

How do you prevent moisture damage in transit?

Humidity-sensitive lines travel with desiccant inside sealed export cartons, and metal surfaces are separated from finished faces so condensation cannot transfer a mark. We also avoid packing timber-based products next to cold metal surfaces that can sweat during a temperature change at sea.

Do you inspect every item or take samples?

Critical dimensions, finishes and hardware are checked line by line at the pre-loading stage; for high-volume repetitive items such as tiles we apply a batch sampling plan and verify the shade and calibre of every carton label. The inspection sheet records which method was used for each line.

Can I get the inspection report before payment?

Yes. We issue the inspection sheet and the container photographs before the balance is settled, together with the packing list and the document set. This is the point at which a client can hold shipment if a line does not match the approved sample.

Send the schedule, get a landed quotation

Give us the bill of quantities, the destination port and the target delivery window. We return a consolidated quotation with the Incoterm, the packing list and the container plan. See the cost guide for quoted ranges, contact INDECO or read the material guides.